The Wind, Solar and Storage energy micro grid system project in Jiaozhou Park of East Soft
1. Project introduction
This project is the first wind, solar and energy storage micro grid system in Qingdao, it includes the wind turbine,
solar panel, energy storage and charge unit etc. Each component is dispatched and inter action very well.
This project combines the pitch controlled wind turbine, solar panel, Lithium battery energy storage and DC/AC charging pile,
adopting the currently advanced micro grid integration , dispatch, management and maintenance technology,
realizes the enterprise energy itself consumption, rest power charge grid etc, making the best utilize efficiency for the new energy power.
2. Project finished time: January, 2019
3. Project site: Qingdao city, Shandong province
4. System components
Name |
Specification |
Quantity |
Pitch controlled wind turbine |
10kW/DC400V |
2sets |
Standing free tower and accessory |
16meters |
2sets |
Controller and inverter integration machine |
WB-10kW/AC380V |
2sets |
Solar panel |
1.4MW |
1set |
PV on grid inverter |
60kW |
14sets |
50kW |
4sets |
|
DC transformer |
200kW |
1set |
Energy storage inverter |
100kW |
1set |
250kW |
1set |
|
Bi-direction transformer |
|
1set |
Energy storage system |
500kVh lithium |
1set |
Distribution and Control clausive |
|
1set |
DC charging pile |
15kW |
2sets |
30kW |
2sets |
|
AC charging pile |
7kW |
4sets |
5. Project picture